Categories

Heim Long Dog Training Lead - Orange - 5m

Heim Long Dog Training Lead - Orange - 5m
£5.99  

The training leash is made from a high-quality, non-irritating material (polypropylene). The hand strap gives you optimal control of your pet. Especially suited, for controlling at a distance or for track work. The Heim Long Dog Training Lead - Orange at a glance: Material: high quality polypropylene Colour: bright orange Available in 3 lengths: 5m, 10m and 20m Diameter: 6mm Ideal for training Highly visible in low light conditions The German company, Heim has been producing quality pet supplies for over a hundred years. Quality materials and good craftmanship guarantee the durability of all Heim products.

Check stock and price


Save to favourites

Heim Long Dog Training Lead - Orange - 5m

Most popular Pets in Heim

'Heim Long Dog Training Lead - Orange - 5m' is from the Pets category
Roast Chicken Skin - 250g
Roast Chicken Skin - 250g
£3.49
Heim Long Dog Training Lead - Orange - 20m
Heim Long Dog Training Lead - Orange - 20m
£11.99
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 1
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 1
£34.99
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 2
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 2
£34.99
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 3
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 3
£39.99
Heim Plaited Leather Dog Lead - Black - 200cm
Heim Plaited Leather Dog Lead - Black - 200cm
£9.99
Heim BioThane Tracking Line - Orange - 10m
Heim BioThane Tracking Line - Orange - 10m
£33.99
Heim Riveted Dog Lead - Black - 240cm
Heim Riveted Dog Lead - Black - 240cm
£11.99
Heim Leather Lead & Collar Set - Stars - Set 1
Heim Leather Lead & Collar Set - Stars - Set 1
£26.99
Heim Leather Lead & Collar Set - Stars - Set 2
Heim Leather Lead & Collar Set - Stars - Set 2
£27.99
Heim Leather Lead & Collar Set - Stars - Set 3
Heim Leather Lead & Collar Set - Stars - Set 3
£29.99
Heim Paw Print Dog Collar & Lead Set - Size 35
Heim Paw Print Dog Collar & Lead Set - Size 35
£31.99

Most popular Pets

Most popular Heim

'Heim Long Dog Training Lead - Orange - 5m' is made by Heim
Roast Chicken Skin - 250g
Roast Chicken Skin - 250g
£3.49
Heim Long Dog Training Lead - Orange - 20m
Heim Long Dog Training Lead - Orange - 20m
£11.99
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 1
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 1
£34.99
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 2
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 2
£34.99
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 3
Heim Cork & Leather Tiger Dog Collar & Lead Set - Set 3
£39.99
Heim Plaited Leather Dog Lead - Black - 200cm
Heim Plaited Leather Dog Lead - Black - 200cm
£9.99
Heim BioThane Tracking Line - Orange - 10m
Heim BioThane Tracking Line - Orange - 10m
£33.99
Heim Riveted Dog Lead - Black - 240cm
Heim Riveted Dog Lead - Black - 240cm
£11.99
Heim Leather Lead & Collar Set - Stars - Set 1
Heim Leather Lead & Collar Set - Stars - Set 1
£26.99
Heim Leather Lead & Collar Set - Stars - Set 2
Heim Leather Lead & Collar Set - Stars - Set 2
£27.99
Heim Leather Lead & Collar Set - Stars - Set 3
Heim Leather Lead & Collar Set - Stars - Set 3
£29.99
Heim Paw Print Dog Collar & Lead Set - Size 35
Heim Paw Print Dog Collar & Lead Set - Size 35
£31.99

Most popular Heim

Heim Long Dog Training Lead - Orange - 5m on other UK sites

Heim Long Dog Training Lead - Orange - 5m
£5.99
The training leash is made from a high-quality, non-irritating material (polypropylene). The hand strap gives you optimal control of your pet. Especially suited, for controlling at a distance or for track work. The Heim Long Dog Training Lead - Orange at a glance: Material: high quality polypropylene Colour: bright orange Available in 3 lengths: 5m, 10m and 20m Diameter: 6mm Ideal for training 
- Snow Shovel
£7.99
When the snow falls this winter be prepared with this made-for-the-job Snow Shovel!The simple curving-blade design makes it easy to pick up large quantities of snow; much easier than using a garden spade, and the long wooden handle allows you to 
Connectix 003-3NB4-050-07B 5m Orange Cat5e Utp Moulded Lead
£2.75
Connectix Cat5e UTP Moulded Leads - Connectix 003-3NB4-050-07B, These Connectix enhanced Category 5 UTP Patch Leads are designed to exceed the performance requirements of the Enhanced Category 5 specification. Connectix 003-3NB4-050-07B 5m Orange Cat5e Utp Moulded Lead 
Surge Protected Extension Lead - 5m.
£15.00
£1000 connected equipment warranty. Allows you to plug six items safety into one socket. Protects valuable electrical equipment from surges and spikes. Indicator lights confirms protection. Ready to use with 13 amp fused plug and 5m of cable. 6 sockets with 5m extension cable. 13 amps - . Surge protection with surge indicator. Power indicator. Child-resistant sockets. Suitable for 
Halti Training Lead Large
£14.00
Company Of Animals Halti Training Lead A short lead for heelwork or obedience training, a longer lead for recall and distance work. When used in conjunction with a Halti or a Halti Harness , this lead can also provide a vital double-lead system. 
Barbour Tartan Dog Lead
£21.95
Lightweight dog lead manufactured from durable polypropylene webbing with Barbour tartan trim to the outer. Matching Collar sold separately - 82246619, 82246620, and 82246626. 
Premium Slip Dog Lead
£9.99
Premium Slip Dog Lead Premium Slip Lead For DogsThe CLIX 3 in 1 Slip Lead is an all in one dog training solution It can be used as a head collar or slip lead to prevent pulling or as a fixed collar and lead for general exerciseThe slip lead is a one piece lead made from the finest polyamide stainless steel stop ring and a loop for holding This lead is extremely durable and weather resistant but 
Light Up Dog Lead
£16.99
Make a night time walk with your dog a whole lot safer with this Light Up Dog Lead that can be seen from up to 300 metres away! Made from strong woven nylon with a sturdy clip the top section of the leash is fitted with a LED light transmitting core. Simply press the button to change from constant to flashing mode. Its water-resistant for those inevitable British downpours and has a battery life 
Draper 4 Socket Extension Lead 5m
£13.95
This slimline design is suitable for use with all household appliances including computers and peripherals up to and including 13A. Fitted with 13A fused three pin plug. Length: 5M Manufactured to BS1363 Specifications and BSI Approved ... 
Pedigree Dog on Lead Plush ( Assorted )
£14.55
Pedigree Dog on Lead 27cm Plush assortment 27cm cute soft plush dog on rigid 69cm lead. Two assorted. Age 3+. One supplied. 
Matt & Nat Vegan Noa Dog Lead - Black
£29.95
A vegan leather dog lead complete with a handle ethically made from PVC with a metal clip. Pair with the matching London Dog Collar from Matt & Nat in Black or mix and match with Frost for a stylish daily walk.Total length 111.7cmHandle length 25.4 
Boyz Toys Dog Lead and Collar, Green
£4.00
A dog is a man's best friend so it's only right that they can enjoy the great outdoors in the same way you do! This Collar & Lead from Boyz Toys is ideal for small to medium dogs. 
Masterplug 2 Socket 5m Extension Lead 10A White
£9.99
This extension lead is ideal for powering home appliances and other electrical equipment. It features safety shuttered sockets and is non-rewirable. 

Heim Long Dog Training Lead - Orange - 5m on other UK sites

Heim Long Dog Training Lead - Orange - 5m on USA sites

Allen Black/ Cherry Queen Bed
$186.99
The Allen queen bed offers minimalist design with simple comfort in mind. The solid rubberwood rectangular headboard with a burnished cherry wood finish, complete with black-finished frame. Add a touch of modern style and sophistication to your room with this Allen bed. This platform bed combines two contrasting colors of metal and wood to create an elegant appeal. Sturdy metal legs and a sleek 
Living World Harness/Lead Large Assorted Colors
$8.99
Living World Harness and Lead Set provides a safe, practical and convenient way to walk your small pet. The harness is made of soft, lightweight and breathable polyester fabric that fits very comfortably over your small pets body. It is easy to slip on and fastens securely with velcro and a snap-on clip. It is fully adjustable around the neck, chest and stomach areas. The wear-resistant harness 
XCVI - Stretch Poplin Double Shirred Panel Skirt (Caf ) Women's Skirt
$35.99
This skirt runs large. XCVI™ suggests ordering one size down from your normal size. ; Double your fun in a deliciously modern skirt from XCVI. ; Betwixt vertical panels, cascades of shirred stretch poplin dazzle. ; Drawstring waist tie for a comfy, relaxed fit. ; Attractive a-line cut balances proportions. ; 96% cotton, 4% spandex. ; Machine wash cold, tumble dry low. ; Imported. 
Under Armour Mens Raid International Training Shorts - Orange - M - Orange
$26.66
Think incredibly light, loose, quick-drying & very breathable. Its your new favourite. Features: Loose: Fuller cut for complete comfort HeatGear fabric is incredibly soft & smooth for extreme comfort with very little weight UPF 30+ protects your skin from the suns harmful rays 4-way stretch fabrication allows greater mobility in any direction Moisture Transport System wicks sweat away from the 
ValuePad USA 600 23x24 29 gram Dog Training Puppy Pads
$119.99
Wet newspapers get torn to shreds and leave ink stains, while our very own ValuePad brand puppy pads absorb well and remain strong. ValuePads are also great for dogs experiencing incontinence. -These training pads can be used by people. -Constructed of high quality medical-grade material. -ValuePads wont get caught on your dogs nails like other puppy pads. -Color: White & Blue -1st run 
BVB Long Sleeve Training Jersey Yellow
$54.99
BVB Long Sleeve Training Jersey YellowGames are not won on the pitch, but on the training ground. With PUMAs Licensed Club Teamwear Collection which provides comfort and support to the athlete, results can and will be achieved.Show your support for your favourite club in this Borussia Dortmund Training Jersey which is styled with a Woven PU club badge and Big PUMA Cat heat transfer for pride and 
Frontline Plus (Known as Frontline Combo) Orange Sml Dog Upto 22Lbs (<10kg) 3.00
$34.99
\Frontline Plus (Known as Frontline Combo) provides convenient and effective flea and tick control in dogs and cats, puppies and kittens. It is effective against all stages of the brown dog tick, the A\ 
Under Armour Mens Armour HeatGear Long Sleeve Compression Training Top - Carbon Heather/Black - XXL
$36.17
Armour is the first thing you put on & the last thing you take off, every time you work out or compete.Features:HeatGear fabric, with all the benefits of UA Compression, comfortable enough to be worn all dayStretch-mesh underarm panels deliver strategic ventilationUPF 30+ protects your skin from the suns harmful rays4-way stretch fabrication allows greater mobility in any directionMoisture 
LRG Opponent Training Mens Shorts
$78.99
LRG Opponent Training shorts. French terry sweat shorts with side seam welt front pockets and welt back pocket. Built in leggings with zipper at leg openings. Elastic drawstring waist. Approx shorts outseam: 21\(53cm). Shorts: 60% cotton/40% polyester. Leggings: 92% polyester/8% spandex. Machine wash. Imported. 
3 Step Dog Stairs
$219.99
These 3 step pet steps are designed with steps that are not only the same depth of human steps but the stairs are angled in the same way as human stairs. This makes this design perfect for our larger best friends (up to 150lbs!) or our smaller pets that cant climb the steeper steps. Pet steps are ideal for helping our friends that are aging or have hip or leg problems climb to their favorite 
Joules Wellyprint Womens Print Welly - Navy Dog
$69.00
From striking stripes and detailed florals to scenes that sing of our country heritage. No matter where you are from farmyards to festivals our new printed wellies will make sure you stand out from the crowd.5% of the sale of the Black Bees wellies will be donated to the British Bee Keepers Association. 

Heim Long Dog Training Lead - Orange - 5m on USA sites

Brands

Thank you for visiting Heim Long Dog Training Lead - Orange - 5m on masterpets.co.uk

We bring the products from many websites to one website for you to search, save and compare.